China Factory Manufacture Mining Machines G10 Pneumatic Air Hammer Mini Easy Moving

Product Details
Customization: Available
Application: Mining
Condition: New
Still deciding? Get samples of US$ 45/Set
Request Sample
Gold Member Since 2020

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

to see all verified strength labels (20)
  • China Factory Manufacture Mining Machines G10 Pneumatic Air Hammer Mini Easy Moving
  • China Factory Manufacture Mining Machines G10 Pneumatic Air Hammer Mini Easy Moving
  • China Factory Manufacture Mining Machines G10 Pneumatic Air Hammer Mini Easy Moving
  • China Factory Manufacture Mining Machines G10 Pneumatic Air Hammer Mini Easy Moving
  • China Factory Manufacture Mining Machines G10 Pneumatic Air Hammer Mini Easy Moving
  • China Factory Manufacture Mining Machines G10 Pneumatic Air Hammer Mini Easy Moving
Find Similar Products
  • Overview
  • Product Description
  • Product Parameters
  • Detailed Photos
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
G10
Customized
Customized
Type
Air Hammer
Percussive Frequency
16Hz
N.W
10.5kg
Length
465mm
Air Consumption
26L/S
Air Inlet
3/4 P/T
Working Style
Reciprocating Type
Pneumatic Drill Range
Mining
Degree of Automation
Semi-automatic
Screwdriver Startup Mode
Under pressure
Usage
Pneumatic Paving Breaker
Air Wrench Type
Air Shovel
Brand
Shenli
Transport Package
Carton/Wooden Box
Specification
54*19*14CM
Trademark
SHENLI
Origin
Hebei
HS Code
8201300090
Production Capacity
10000 Sets/Month

Product Description

China Factory Manufacture Mining Machines G10 Pneumatic Air Hammer Mini Easy Moving

Product Description

G10 air pick is suitable for breaking rock, concrete and other objects, especially suitable Demolish the concrete ground and wall which are broken and firm in the city foundation construction project Used in road and pipeline construction to cut and crush black and white pavement for convenience Repair and gouge road surface, also suitable for quarrying and other similar crushing operations.

China Factory Manufacture Mining Machines G10 Pneumatic Air Hammer Mini Easy Moving

Product introduction:

The G10 air pick uses compressed air as the power tool, and the compressed air is distributed in two sections of the cylinder by the tubular distribution diverter valve in turn, so that the hammer body makes repeated impacting movements and impacts the end of the pick, causing the pick to strike into the rock or ore layer, causing it to split into pieces.

Breaking concrete, breaking permafrost, breaking the ice; road repair, planing pits, trenching; mining soft rock, coal mining, etc. Replacement attachments can be used for such as loading and unloading track pins and other construction work that requires impact is more flexible and lighter than similar products, suitable for all-round work, especially in small working spaces, upward or ascent. It is also very popular as an air shovel.

Function:

G10 air pick an applicable scope

1,Coal mining in coal mines, planning the foot pit of the column, opening the ditch;

2,Mining soft rock;

3,Breaking concrete, permafrost, and ice in construction and installation projects;

4,In the mechanical industry, where impact movement is required, such as loading and unloading of tractor and tank track pins.

G10/G7 air pick daily maintenance

1. The normal working air pressure of the air pick is 0.5MPa. During normal operation, add lubricating oil every 2h. When filling oil, first remove the air pipe joint, place the air pick at an angle, press the handle of the pick, and inject from the connecting pipe.

2. During the use of the air pick, disassemble it at least twice a week, clean it with clean kerosene, dry it, apply lubricating oil, and then assemble it. When parts are found to be worn and out of order, they should be replaced in time, and it is strictly forbidden to work with air picks.

3. When the accumulative use time of the air pick reaches more than 8h, the air pick should be cleaned.

4. When the air pick is idle for more than a week, oil the air pick for maintenance.

5. Polish the burr pick and drill in time.
 

Precautions:

1. Before using the air pick, lubricate the air pick with oil.

2. When using the air picks, there should be no less than 3 spare air picks, and the continuous working time of each air pick should not exceed 2.5h.

3. During operation, hold the handle of the pick and press it in the direction of the chisel so that the pick is strong against the socket.

4. Select the trachea to ensure that the inside of the pipe is clean and clean and the trachea joint is firmly and reliably connected.

5. During operation, do not insert all the picks and drills into broken objects to prevent air strikes.

6. When the pickaxe is stuck in the titanium lump, do not shake the pickaxe violently to avoid damage to the body.

7. During operation, choose the pick and drill reasonably. According to the hardness of the titanium lump, choose a different pick and drill. The harder the titanium lump, the shorter the pick and drill, and pay attention to check the heating of the shank to prevent the pick and drill from being stuck.

8. When drilling the burrs, it should be handled in time, and the burrs should not be used for drilling operations.

9. Air strikes are strictly prohibited.

Product Parameters

Percussive frequency
 ≥43 J
Impact frequency
 16 Hz
Air Consumption
26 L/S
Bit Fixation
Spring clip
Total length
 575 MM
Net Weight
10.5 KG
Pickaxe
300/350/400

Detailed Photos

China Factory Manufacture Mining Machines G10 Pneumatic Air Hammer Mini Easy Moving

Company Profile

 

China Factory Manufacture Mining Machines G10 Pneumatic Air Hammer Mini Easy Moving

FAQ

1.How do your prices compare to the manufacturer/factory?

  We are the main distributor of major construction machinery manufacturers/factories in China and keep getting the best dealer prices. From the comparison and feedback from many customers, our price is even more competitive than the factory/factory price.

2.How is the delivery time?

  In general, we can deliver ordinary machines immediately to our customers within 7 days, as we have various resources to inspect stock machines, locally and nationwide, and receive machines in a timely manner. But it takes more than 30 days for a manufacturer/factory to produce an order machine.

3.How often can you respond to customer inquiries?

  Our team is made up of a group of hardworking and dynamic people who work around the clock to respond to customer inquiries and questions. Most issues can be successfully resolved within 8 hours, while manufacturers/factories take longer to respond.

4.Which payment methods can you accept?

 Usually we can use wire transfer or letter of credit, and sometimes DP. (1) Wire transfer, 30% deposit in advance, 70% balance paid before shipment, long-term cooperation customers can present a copy of the original bill of lading. (2) Letter of credit, 100% irrevocable letter of credit without "soft   terms" from internationally recognized banks can be accepted. Please seek advice from the sales manager you work with.

5.Which clauses in the Incoterms 2010 can you use?

  We are a professional and mature international player and can handle all INCOTERMS 2010, we usually work on regular terms like FOB, CFR, CIF, CIP, DAP.

6.How long are your prices valid?

  We are a gentle and friendly supplier, never greedy for profit. Our prices remain largely stable throughout the year. We will only adjust the price according to the following two situations: (1) USD exchange rate: According to the international currency exchange rate, the RMB exchange rate is quite different; (2) The manufacturer/factory adjusted the machine price due to the increase of labor cost or raw material cost.

7.What logistics methods can you use for shipping?

We can transport construction machinery with various means of transport. (1) 80% of our shipping will be by the sea, to all major continents such as Africa, South America, Middle East. (2) China's inland neighboring countries, such as Russia, Mongolia, Kazakhstan, Kyrgyzstan, Tajikistan, Uzbekistan, Turkmenistan, etc., can transport by road or rail. (3) For urgently needed light spare parts, we can provide international express services, such as DHL, TNT, UPS, FedEx, etc.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier